April 1975 – Ipswich, UK
Willis Building
Externally, the building reinforces rather than confronts the urban grain. Low-rise, with a free-form plan, it responds to the scale of surrounding buildings, while its facade curves in response to the irregular medieval street pattern, flowing to the edges of its site like a pancake in a pan.
The sheath-like, glass curtain wall, which was developed with the glazing manufacturer Pilkington, pushed the technology of the day to its very limits. The solar-tinted glazing panels, each 2 metres square, are connected by means of corner patch fittings, then silicone jointed, forming a three-storey-high curtain, which is suspended from a clamping strip at roof level. A discreet system of internal glass fins at each floor level provides the necessary wind bracing. By day the glass appears almost black and reflects an eclectic, fragmented collage of Ipswich's old buildings; while by night it dissolves dramatically to reveal the activity within.
Conceived before the oil crises of the mid-1970s, and heated by natural gas, Willis Faber was a pioneering example of energy conscious design, its deep plan and insulating grass roof ensuring extremely good overall thermal performance. Recognising these innovations, over the years the building has attracted almost as many awards for energy efficiency as it has for its architecture.
Conceived before the oil crises of the mid-1970s, and heated by natural gas, Willis Faber was a pioneering example of energy conscious design, its deep plan and insulating grass roof ensuring extremely good overall thermal performance. Recognising these innovations, over the years the building has attracted almost as many awards for energy efficiency as it has for its architecture.
The project also pioneered the use of raised office floors, anticipating the revolution in information technology; so much so, that when Willis Faber introduced computerisation it was able to do so with minimal disruption - unlike most of its rivals, who were forced to move to new buildings. Paradoxically, although it was designed for flexibility, the building now has Grade 1 listed status: an honour that means it cannot be changed.
Appointment
1971
Completion
1975
Area
21,255m²
Height
1,350
Structural Engineer
Anthony Hunt Associates
Client
Willis Faber & Dumas Ltd